Continued installing the base plate around the foundation. Found a drawing issue, the building is 20mm smaller than the original architect drawing. This issue had not been spotted previously and after a discussion we decided to align the building with the north and west walls flush with the foundation.
Lesson learnt – the drawings need to be checked for errors. It is probably better to get them checked professionally.